|
|
 |
CIM el Camp - eastern
sector |
| |
|
| |
Documents |
| |
Specific modification GPUW Tarragona |
| |
Report |
[2,4 MB.] |
| |
1.1
Situation |
[0,4 MB.] |
| |
1.2
Location |
[2,8 MB.] |
| |
1.3 Area |
[4,9 MB.] |
| |
1.4
Properties |
[5,2 MB.] |
| |
1.5 Current planning - sheet 1 |
[1,0 MB.] |
| |
1.5
Current planning - sheet 2 |
[2,8 MB.] |
| |
1.6
Urban services |
[5,0 MB.] |
| |
2.1 Modified planning - sheet 1 |
[4,0 MB.] |
| |
2.1 Modified planning - sheet 2 |
[3,0 MB.] |
| |
Annex 3 -Environmental
sustainability report |
[1,1 MB.] |
| |
Annex
4 -AMG Study |
[3,0 MB.] |
| |
Annex 5 -Executive
summary 1 |
[1,5 MB.] |
| |
|
|